


PROJECT DESCRIPTION
Review of implementation and modification studies, resolution of issues arising during the construction phase of a closed conduit for the regulation of the Eschatia Stream over a length of 4,500 m within a residential area.
ASSIGNING AUTHORITY
Ministry of Infrastructure and Transport, Department of Flood Control and Reclamations Works (D19), Greece
CONTRACT DURATION
04/2021-Σε εξέλιξη